Samsung Electronics to Showcase 5XX-Layer Ultra-High-Stacking 3D NAND at ISSCC 2027
IT Home, November 26: According to the official preview of the 2027 IEEE ISSCC, Samsung Electronics will present 5XX-layer ultra-high-stacking 3D NAND at the industry-academia conference held in San Francisco from February 14 to 18 next year.
Samsung Electronics officially announced its 4XX-layer 10th-generation V-NAND at FMS 2026. The upcoming 5XX-layer NAND still adopts the wafer bonding process, achieving an areal density of 42 Gb / mm² in TLC mode, with a write throughput of 290MB/s and a per-pin I/O rate of 6.8Gb/s.

It is worth noting that Solidigm will also present its new-generation 240-layer PLC NAND flash at this conference. It still uses a floating-gate structure, with an areal density of approximately 31 Gb / mm². This new NAND is expected to be unveiled for the first time at next month's IEEE IEDM 2026.
Other notable results include Samsung Electronics' 48GB 17Gbps HBM4E memory, SK hynix's 16Gb DDR DRAM using wafer-to-wafer bonding, and more.
- "Huawei to Showcase Five-Layer Hybrid-Bonded HBM, Logic Chip 3D Stacking and Other Advanced Technologies at ISSCC 2027"
- https://submissions.mirasmart.com/ISSCC2027/PDF/ISSCC2027AdvanceProgram.pdf
Advertising statement: External redirect links contained in this article (including but not limited to hyperlinks, QR codes, passwords, and other forms) are used to convey more information and save selection time. The results are for reference only. All articles on IT Home containing external links include this statement.
Related Articles
- Samsung and SK hynix reportedly have obtained partial rights to use YMTC's Xtacking architecture technology
- SK hynix plans to mass-produce 3D DRAM within 4 to 5 years, with the first product using 100-layer stacking
- Samsung Electronics plans to sample the CXL 3.2 memory module MD310 in early 2027: based on DDR5, up to 256GB
- Samsung and SK hynix need 260,000 skilled workers to expand wafer fabs; the South Korean government deploys veterans to fill the gap
- Samsung plans to expand advanced NAND capacity at its Xi'an plant and upgrade V9 flash production lines to expand eSSD supply for AI data centers
- SK hynix reportedly plans to prioritize bulk procurement of Besi hybrid bonding equipment to serve future HBM memory production needs