AIFeed

TSMC Reportedly to Hold Expansion Celebration at Arizona Site on December 4

AI summary

According to Taiwan's United Daily News, TSMC plans to hold an expansion celebration on December 4 local time at its TSMC Arizona semiconductor manufacturing cluster, with a supplier welcome dinner the night before. In an invitation signed personally by TSMC Chairman C.C. Wei, he said that with the company's acquisition of land south of Arizona State Route 303, TSMC will build a large campus spanning both sides of the road, with a total site area of up to 2,000 acres (about 810 hectares). TSMC Arizona's fourth fab and first advanced packaging plant broke ground in April this year, and the celebration may announce further updates on subsequent fabs, advanced packaging projects, a R&D center, and even a Texas project.

Translation(model translation, not the source's own text)

Report: TSMC to Hold Expansion Celebration at Its Arizona Site on December 4

IT Home, November 25: According to a report today by Taiwanese media outlet United Daily News, TSMC plans to hold an expansion celebration on December 4 local time at its TSMC Arizona semiconductor manufacturing cluster in Arizona, USA, with a supplier welcome dinner the night before.

TSMC Chairman C.C. Wei said in an invitation letter personally signed by him that, with the company acquiring land south of Arizona State Route 303, TSMC will build a large campus spanning both sides of the road, with a total site area of up to 2,000 acres (IT Home note: about 810 hectares).

IT Home notes that construction on TSMC Arizona's fourth wafer fab and first advanced packaging facility began in April this year. The expansion celebration may announce further developments regarding subsequent wafer fabs, advanced packaging projects, an R&D center, and even a Texas project.

Related Articles

  • TSMC Submits Application to Texas State Government, Plans to Build Wafer Fab in Brazos
  • Li Auto CTO Xie Yan Speaks at TSMC OIP Forum, Explains Mach M100's Full Path from Technology to Application
  • Report: TSMC and Other Foundries Adjust Prices, Increases Ranging from 10% to Over 20%
  • AI Circular Financing Doubts Intensify, TSMC Plans to Supply Capacity Based on Each Company's Credit Line
  • TSMC Outsources CoWoS Advanced Packaging oS Capacity to Xintec, Which Will Build Production Lines in TSMC Facilities
  • Searching for the "Next Nvidia": TSMC Plans to Establish a $500 Million Venture Capital Fund

The translation is machine-generated and individual terms may be off. Nothing is rewritten or cut; the original is authoritative.

Published by IT之家
This site only summarises and aggregates; copyright stays with the original author. Headlines and summaries follow the source — where they differ, the original wins.
Read the original ↗