Designed for 350 km/h: Jibin High-Speed Railway Begins Trial Operation, Shandong's Largest Underground High-Speed Rail Station Tested Simultaneously
IT之家 November 25 news, according to CCTV News, at 8:30 on November 25, test EMU train 55301 departed smoothly from Jinan East Station, marking the successful completion of joint commissioning and testing for the Jinan connecting line of the newly built Tianjin–Weifang High-Speed Railway — the Jibin High-Speed Railway — which has now officially entered the trial operation stage, with full-line opening and operation countdown underway.
The Jibin High-Speed Railway starts from Jinan East Station and terminates at Binzhou Station, with a main line length of approximately 145.3 kilometers and a design speed of 350 km/h. The line has 6 stations: Jinan East, Yaoqiang Airport, Jiyang, Shanghe, Huimin, and Binzhou. Among them, Jinan East Station and Binzhou Station are existing stations, while the rest are newly built.

The Yaoqiang Airport Station on the Jibin High-Speed Railway has a building area of approximately 57,000 square meters and a station layout of 2 platforms and 6 tracks, making it the underground high-speed rail station with the largest platform-and-track scale in Shandong Province. The station is conducting full-process testing of passenger services simultaneously with the other stations along the line.
According to the introduction, Yaoqiang Airport Station employs an adaptive platform screen door system. At the train entry end of the platform, AI recognition cameras are used to autonomously determine the train model of the incoming train; at the exit end, LiDAR determines the precise stopping position of the train. Through system calculation, the position where the train opens its doors is determined within 1 second, and the platform screen doors move autonomously along the track and can automatically align with the train doors.
IT之家 has learned that this trial operation will last about one month, and the Jibin High-Speed Railway is expected to meet the conditions for opening and operation before the end of this year.
Related Articles
- The Jinan connecting line of the Tianjin–Weifang High-Speed Railway, the "Jibin High-Speed Railway," begins joint commissioning and testing, with a design speed of 350 km/h
- With a total length of approximately 6.7 kilometers, the "First Tunnel of the Thousand-Mile Haihe High-Speed Railway" successfully passes beneath the Haihe River