AIFeed

Budgeted Subset Selection with a Transferable Learned Value Model

Summary

arXiv:2611.27751v1 Announce Type: new Abstract: Subset selection is a fundamental task in machine learning, statistics and combinatorial optimisation, with applications in active learning, band selection, input selection and experimental design. The utility of a subset depends on information revealed only after the selection, such as labels or responses, and on interactions among selected candidates. Existing approaches combine value estimation and redundancy control in application-specific ways, which limits their use in other domains. This paper introduces Subset Acquisition with Learned Value Estimates and Search (SALVES), a framework that decomposes subset selection into two components. First, a value model is trained by supervised learning on tasks where the hidden information is known. On a new task, it predicts the utility each candidate would add to the current selection. Second, a selection step chooses the subset from these predictions, typically by simulated annealing with a…

Original text(via arXiv stat.ML)

Statistics > Machine Learning

Title:Budgeted Subset Selection with a Transferable Learned Value Model

Abstract:Subset selection is a fundamental task in machine learning, statistics and combinatorial optimisation, with applications in active learning, band selection, input selection and experimental design. The utility of a subset depends on information revealed only after the selection, such as labels or responses, and on interactions among selected candidates. Existing approaches combine value estimation and redundancy control in application-specific ways, which limits their use in other domains. This paper introduces Subset Acquisition with Learned Value Estimates and Search (SALVES), a framework that decomposes subset selection into two components. First, a value model is trained by supervised learning on tasks where the hidden information is known. On a new task, it predicts the utility each candidate would add to the current selection. Second, a selection step chooses the subset from these predictions, typically by simulated annealing with a diversity term penalising redundancy. The value model transfers to new classes, pretrained networks, datasets and sensors, and from synthetic to real data. On the four applications, SALVES matches or outperforms application-specific baselines on average. It requires substantially fewer bands for equal accuracy and remains reliable in input selection where individual baselines fail.
Subjects:Machine Learning (stat.ML) ; Machine Learning (cs.LG)
Cite as:arXiv:2611.27751 [stat.ML]
(or arXiv:2611.27751v1 [stat.ML] for this version)
https://doi.org/10.48550/arXiv.2611.27751 arXiv-issued DOI via DataCite (pending registration)

Submission history

Access Paper:

  • HTML (experimental)

Current browse context:

References & Citations

  • Google Scholar
  • Semantic Scholar

BibTeX formatted citation

Bookmark

Bibliographic and Citation Tools

Code, Data and Media Associated with this Article

Demos

Recommenders and Search Tools

arXivLabs: experimental projects with community collaborators

arXivLabs is a framework that allows collaborators to develop and share new arXiv features directly on our website.

Both individuals and organizations that work with arXivLabs have embraced and accepted our values of openness, community, excellence, and user data privacy. arXiv is committed to these values and only works with partners that adhere to them.

Have an idea for a project that will add value for arXiv's community? Learn more about arXivLabs.

The text above was extracted automatically from the source page and may miss images, tables or code blocks. The original is authoritative.

Published by arXiv stat.ML
This site only summarises and aggregates; copyright stays with the original author. Headlines and summaries follow the source — where they differ, the original wins.
Read the original ↗